Skip to main navigation.

HCE Other Rates and Fees

Name Change Fee = $10
NSF Check Fee = $20
Connect Fee = $25
Service Limiter Adapter Fee = $25
Disconnect for Non-Payment Fee = $25
Reconnect for Non-Payment Fee = $25
Collection Fee = $40
Security Deposit (non-Electric Heat) = $200
Security Deposit (Electric Heat) = $450
Security Deposit (Other) = The greater of the existing Security Deposit or $200 or two times the monthly average from the latest twelve month period rounded to the nearest ten dollar increment.

Powered by Touchstone Energy Cooperatives Logo
Coop Connections Card Info Kids Zone Touchstone Energy Together We Save